Project Profile
Covid Hospital
- Two-day Quick Ship of 5 ECM fan systems
- 3.5-hour hour local installation time
- Fan system designed to fit into a 30” air handler
- No rigging equipment or special handling needed
- Zero-maintenance fan system installed, keeping hospital costs low
The Situation
A hospital floor needed a renovation
Project location: Nashville, TN
Property size: 26,262 sq. ft.
Situation: A Nashville hospital needed to immediately convert its unoccupied 8th floor into a dedicated COVID-19 patient care unit in less than three weeks.
The Process
Q-PAC manufactured and Quick Shipped five fan array systems in just two days which were installed within 4 hours.
- Designed the fan systems to meet the airflow, static pressure and size constraints of the 30" installation space height requirements using Q-PAC’s intuitive custom selection software, QUIPS
- Internally fabricated and assembled the modular wall, Quick Connect Box, control panel, and ECM fans
- Quick Shipped the five integrated fan systems as pre-packaged kits with labeling and fasteners in under 48 hours
- Installed the fan systems using Q-PAC’s “plug-and-play” capabilities and on-call technical support team
The Results
How Q-PAC’s fan systems helped a Nashville, TN hospital quickly prepare for treating COVID-19 patients
Q-PAC exceeded the fan system delivery, installation, and operational expectations of both the project contractor and hospital. Each system's modular and integrated design measured less than 25" in height, with all components being hand-carriable for fast and easy installation. Project contractors installed all five fan systems in less than 4 hours upon delivery requiring less installation personnel and electrician support.