• Skip to main content
  • Skip to footer

Q-PAC

  • Our System
    • Design
    • Installation
    • Operation
  • Resource Center
    • Downloadable Guides
    • Support
    • Project Profiles
      • The U.S. Steel Tower (USX)
      • Hospital Installation
      • Department Store Installation
      • Commercial Plaza Installation
      • Franklin Templeton
      • Goodman Theatre
      • 2000 Westchester Installation
    • Blog
  • Company
    • Team
    • Culture
    • Careers
  • Contact Us
  • QUIPS Login
Universal Hero

Project Profile

Covid Hospital

  • Two-day Quick Ship of 5 ECM fan systems
  • 3.5-hour hour local installation time
  • Fan system designed to fit into a 30” air handler
  • No rigging equipment or special handling needed
  • Zero-maintenance fan system installed, keeping hospital costs low
19

The Situation

A hospital floor needed a renovation

Project location: Nashville, TN
Property size: 26,262 sq. ft.

Situation: A Nashville hospital needed to immediately convert its unoccupied 8th floor into a dedicated COVID-19 patient care unit in less than three weeks.

The Process

Q-PAC manufactured and Quick Shipped five fan array systems in just two days which were installed within 4 hours.

  • Designed the fan systems to meet the airflow, static pressure and size constraints of the 30" installation space height requirements using Q-PAC’s intuitive custom selection software, QUIPS
  • Internally fabricated and assembled the modular wall, Quick Connect Box, control panel, and ECM fans
  • Quick Shipped the five integrated fan systems as pre-packaged kits with labeling and fasteners in under 48 hours
  • Installed the fan systems using Q-PAC’s “plug-and-play” capabilities and on-call technical support team

The Results

How Q-PAC’s fan systems helped a Nashville, TN hospital quickly prepare for treating COVID-19 patients

Q-PAC exceeded the fan system delivery, installation, and operational expectations of both the project contractor and hospital. Each system's modular and integrated design measured less than 25" in height, with all components being hand-carriable for fast and easy installation. Project contractors installed all five fan systems in less than 4 hours upon delivery requiring less installation personnel and electrician support.

Download the PDF version of this project profile

Download this project profile

Find a simply efficient solution

Collaborate with our team of experts to solve your HVAC challenge

Get a quote today

Explore other project profiles

Our system was designed to be adaptable. See how we have
provided effective solutions across a variety of industries

Department Store Cover Image

Department Store Installation

Read about the situation

Plaza Cover Image

Commercial Plaza Installation

Read about the situation

Tower Cover Image

U.S. Steel Tower Installation

Read about the situation

QPAC Footer logo

Contact our team

  • sales@q-pac.com
  • 904-863-5300

4010 Deerpark Blvd,
Elkton, FL 32033

Follow us

dashicons-facebook-alt dashicons-youtube dashicons-linkedin

Stay informed with our monthly newsletter

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Privacy Policy  |  Web Accessibility  |  Site Map

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Copyright © 2023 Q-Pac. All rights reserved. Designed by Tinyfrog Technologies.